Moscow Southeast Booster Station Improvements - Distribution
The project includes modifications to the existing City of Moscow Southeast Booster Station. Specific improvements include: 1. An onsite chlorine generation and injection system. 2. A new magnetic flow meter installed in a vault outside the booster station. 3. A new motor control center. 4. A new variable frequency drive for booster pump #1. 5. A new motor for booster pump #1. 6. Associated control system modifications. 7. A chloring residual analyzer and sampling line. 8. A new main disconnect switch. 9. Connection of existing standby power generator and automatic transfer switch to new power distribution system. 10. Owner will provide programming of Telemetry/SCADA system.
Status
Accepting Bids
Prebid Date1/14/21 10:00 am
Bid Date1/26/21 2:00 pm
Company & Contacts
City of Moscow
Scott Bontrager (208) 883-7025
Location
Moscow, ID