Carlin Bay Water System Raw Water Intake - Distribution

The project consists of the installation of a new lake water intake structure, two 20-hp submersible pumps, and approximately 375 LF of 6-inch HDPE waterline. The work will include approximately 100 LF of open trench pipe installation below the Coeur d’Alene Lake ordinary high-water mark and the remainder of the pipe will be placed on the lake floor. All work shall be in accordance with the contract documents and permitting requirements including, but not limited to, the Idaho Department of Lands Lake Encroachment Permit and Department of Army Corps. of Engineers permits included with these documents.

Status

Accepting Bids

Prebid Date1/6/21 10:00 am

Bid Date1/21/21 2:00 pm