Wastewater System Improvements - 2020 - Distribution

Work for this Project includes the installation of a headworks screen, lagoon control structures, a three-pump vertical turbine effluent pump station, approximately 32,000 linear feet of 14-inch inside diameter pressure pipeline, a three-pump vertical turbine irrigation pump station, and a 400-acre-foot irrigation storage pond with 60 mil high-density polyethylene liner.

Status

Accepting Bids

Prebid Date1/5/21 1:00 pm

Bid Date1/19/21 2:00 pm

Company & Contacts

Anderson Perry & Associates

Brett Moore   (541) 963-8309

Location

Baker City, OR