City of Bonners Ferry - Moyie Dam Concrete Rehabilitation Project - Distribution
The project consists of the following: Rehabilitating the downstream concrete surface of the Moyie Dam including the west and east spillways and dam face. Project includes but is not limited to, erosion/sediment control and mitigation, hydrodemolition, concrete doweling, concrete reinforcement, shotcrete, cast-in-place concrete, development of a work plan for staging and access and adherence to the quality control inspection plan for the project. The project is anticipated to span multiple years and the Base Bid includes 3 schedules for the rehabilitation identified in the plans.
Status
Accepting Bids
Prebid Date12/16/20 10:00 am
Bid Date1/27/21 2:00 pm