Sierra Water System Upgrades - Distribution

The scope of work, covering two job sites, consists of mobilization, erosion control measures, site grading, placement of gravel, site fencing, installation of two generators with concrete slab foundations, demolition of existing enclosure and controls, installation of an electrical control panel with canopy roof structure, installation of two automatic transfer switches, installation of wireless input/output panels, light fixtures and lamps, and running underground power lines from existing power source to generators, electrical control panel, and existing buildings.

Status

Bidding Closed

Bid Date12/29/20 10:00 am

Company & Contacts

Pace Engineers

April Cook   (425) 827-2014

Location

Buckley, WA