GEG EDS Machine Replacement Project - 1744-1908 - Distribution

The Work includes providing, modifying and installing new conveyor and associated controls equipment to support the recapitalization of the existing EDS screening machines throughout Concourse A&B, and C (5 total machines). This includes providing temporary portering of checked baggage during modifications to the systems. Checked Baggage Screening Area will remain in operation during construction to neighboring systems. Concourse C requires a temporary Checked Baggage Screening Area in the lobby, included as part of scope of work.

Status

Accepting Bids

Prebid Date10/14/20 2:00 pm

Bid Date11/10/20 2:00 pm

Company & Contacts

Spokane International Airport

Lisa Corcoran lcorcoran@spokaneairports.net   (509) 455-6406

Location

Spokane, WA