Dunn Pump Station Pump Replacement - Distribution

Remove (3) existing pumps, associated piping, supports, electrical, control components, bypass pumping. Install (4) new 215 HP pumps (supplied by the district), new suction and discharge piping, valves, minor structural modifications, electrical and controls systems.

Status

Accepting Bids

Prebid Date10/20/20 2:00 pm

Bid Date11/3/20 2:15 pm

Company & Contacts

City of Central Point

Carl Tappert   (541) 779-4144

Location

Central Point, OR