2020 Water Main and PRV Replacements - Distribution

The project consists of 4 different project sites in Snohomish County, designated as Schedules A-D. The work for all four sites is to be done as part of the project and they are to be bid on together as one project. Schedules A and B include the installation of approximately 1,100 lineal feet of 8-inch diameter pipe and 560 lineal feet of 4-inch diameter pipe to replace existing water main. Schedules C and D include the installation of two new Pressure Reducer Valve Vaults. The project also requires replacement of services, fire hydrants and other system appurtenances.

Status

Bidding Closed

Bid Date10/9/20 10:00 am

Company & Contacts

Pace Engineers

April Cook   (425) 827-2014

Location

Snohomish, WA