Well No. 11 Air Stripping Tower - Distribution

This project consists of the installation of a new air stripping tower and blower, 250 hp vertical turbine pump, electrical equipment and controls, NaOCL metering pump skid, a pre-cast concrete water vault, concrete footings, a steel sun shade structure, and water piping. Equipment will be contractor installed, all in accordance with the technical specifications, drawings, and contract documents. Equipment that will be owner-furnished includes the air stripping tower and blower, the NaOCL metering pump skid, and the pre-cast concrete water vault, all other equipment shall be furnished by contractor to complete the work.

Status

Accepting Bids

Bid Date6/2/20 10:00 am

Company & Contacts

City of West Richland

Ilka Gilliam   (509) 967-5434

Location

West Richland, WA