East Valley School District Secure Entries - Distribution

The Work includes is not limited to interior improvements and minor sitework. The building construction includes structural steel, steel and wood framing systems, interior finish carpentry, building insulation, fire stopping systems, joint sealants, steel doors and frames, flush wood doors, door hardware, aluminum-framed entrances and storefronts, glazing, gypsum board, acoustic panel ceilings, resilient base and accessories, resilient flooring, tile carpeting, interior and exterior painting, signage, miscellaneous specialties, roller window shades and minor site improvements as indicated on the Drawings and specified herein.

Status

Bidding Closed

Prebid Date5/13/20 10:00 am

Bid Date5/20/20 3:00 pm

Company & Contacts

Architects West, Inc

Ed Champagne edc@architectswest.com   (208) 667-9402

Location

Spokane Valley, WA