Wallula Dodd Water System Mechanical and Electrical Design - Distribution

The Work includes three project areas: Reservoir Site, Dodd Road Pump Station, and Alluvium Wells and are generally described as follows: The Work includes construction of approximately 200 feet of 12-inch water main lines and 200 feet of 18-inch water main lines; 270 cubic yards of well drainage swale excavation; groundwater well water and drain piping, fittings, and valves; pressure control valve assemblies; water service connection assemblies; above grade enclosures; sodium hypochlorite chemical system and disinfection building; new well pump and booster pumps; site restoration work; mechanical and electrical equipment and systems startup; testing; together with all other work as specified in the bidding documents. Additive alternatives include reservoir tank mixer(s) and a standby generator.

Status

Accepting Bids

Bid Date6/2/20 2:00 pm

Company & Contacts

Anderson Perry & Associates

John Wells   (509) 529-9260

Location

Wallula, WA