Electric City Lift Station Replacement Project - Distribution

The project generally consists of demolition and replacement of the existing lift station with a new package lift station. One of the pumps in the existing lift station will be salvaged and used in the new lift station and the existing building will be preserved and control panels installed inside this building. The project will also include approximately 50 feet of 10-inch PVC gravity sewer main and 50 feet of 6-inch force main and associated work. In addition to replacement of the lift station this project will include installation of a new package backup generator.

Status

Bidding Closed

Prebid Date4/22/20 11:00 am

Bid Date5/1/20 10:00 am

Company & Contacts

Century West Engineering

Steve Nelson snelson@centurywest.com   (509) 838-3810

Location

Electric City, WA